The work in the studio continues though at a reduced velocity. This is true of handquilting (which is what I'm doing now) in general, and quiltwork as a whole- but it also speaks to the frequency of my time put toward the work in the studio. Likewise virtually here.
For now, someone elses quilt top and my quilting. Deadlines. Next month- two crib quilts with fabric from Ghana.
02 April 2008
Subscribe to:
Posts (Atom)
